Yes we are producing them again not from a bronze casting but from solid steel CNC machine to the original shape. The two lever type is £115.00 and the 1 lever is £95.00. See the photo as to how they look now. All finished June 2007 and selling like hot cakes!!
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||
|
This Month
Month Archive
|
Saturday, June 2
by
VETERAN TRIUMPH SPARES
on Sat 02 Jun 2007 02:18 PM BST
by
VETERAN TRIUMPH SPARES
on Sat 02 Jun 2007 02:17 PM BST
Yes we even make the front stirrup brakes for all veterans and other Triumphs for £170 marks. we have most models in stock other made to order allow 3 months to be hand made if we are out of stock.
by
VETERAN TRIUMPH SPARES
on Sat 02 Jun 2007 02:16 PM BST
Yes we have had many enquires. We have now made 10 b170 check out site under common spares. I am lucky that my factory is next to brooks in brum. I have been in their and theirs not much left for the old bikes. So we have an original b170 and a b180? Seat to copy from. The frames have been laser cut. The fasteners have been machined and the four types of springs are wound. Seat pan dies have been made and have stamped 50 pans so far. Seat clamp has been made from a lost wax casting also available under common spares. Plus see the new B100 leather tops we have had made now for early veterans.
by
VETERAN TRIUMPH SPARES
on Sat 02 Jun 2007 02:15 PM BST
Web site all up and running 21.1.07 Web site now finished and you can submit your order now and pay by pay-pal. All parts now in or on order all parts should be in by June. we have order £5000 of turned parts now to replace most fastener on 1908 to 1914 bikes and junior models. (finished) Link belt is on it way 100meters of 3/4 ,7/8 and 1 inch.(finished) Plug lead and clips.(finished) Main bearings.(finished) Free wheel clutches are getting made now.(finished) Brooks seat are on their way we are making b 130 and b170. around Aug 07. Tool box on their way 20 sets are getting made. around Aug 07 front and rear hubs for 1908 to 1914 10 sets of both.(finished) Front head race bearings are made.(finished) around 20 different casting are being cast frame lugs. around Aug 07 timing covers. some finished rest Aug 07 exhaust boxes. some finished rest Aug 07 keep watch this site they will be up their soon !!!! or other wise ask us to make the other bits and if their is enough en-quires we will make them too!!!
|
Favourite blogs
|
|||||||||||||||||||||||||||||||||||||||||||||||||